P&O Cruise On Britannia 2021
This photograph was taken from deck of Britannia which shows the ship Geoquip Seehorn which is a DP2 geotechnical vessel, converted in 2015 to be a geotechnical drilling vessel, ideally suited to safely completing large scale projects which have a combination of seabed CPT and borehole locations. A dedicated launching mechanism offers a quick, smooth and safe switch between drilling mode and seabed CPT mode through the large moonpool.
With the added benefit of having this efficient system to change between seabed and downhole mode, as well as being capable of piggyback coring, the vessel is a truly versatile asset in our fleet.
P&O Cruise On Britannia 2021
This photograph was taken from deck of Britannia which shows the ship Geoquip Seehorn which is a DP2 geotechnical vessel, converted in 2015 to be a geotechnical drilling vessel, ideally suited to safely completing large scale projects which have a combination of seabed CPT and borehole locations. A dedicated launching mechanism offers a quick, smooth and safe switch between drilling mode and seabed CPT mode through the large moonpool.
With the added benefit of having this efficient system to change between seabed and downhole mode, as well as being capable of piggyback coring, the vessel is a truly versatile asset in our fleet.