Back to photostream

The SOLI-TREE

Taken approx 30 minutes before actual sunrise.

The light has started to show, and a bright streak started to show its face.

The reservoir scheme in the Greenfield Valley and Chew Valley by the Ashton-Under-Lyne, Stalybridge and Dukinfield Waterworks Joint Committee commenced in 1870. The scheme was completed with Dovestone Reservoir in 1968 to collect water from the surrounding moorland.

The main contractor was A.E. Farr (Civil Engineers) of Westbury, Wiltshire. Its construction was opposed by local mill owners, who claimed that damming the river would cut off their water supply.

Taken using :

Nisi V6 Holder, LCPL, 3 Stop GND & 6 Stop ND Filter.

Benro Tripod.

2,543 views
71 faves
21 comments
Uploaded on January 13, 2021
Taken on January 9, 2021