Double Lift Dellner
GB Railfreight Class 92, 92014 prepares to attach to the Caledonian Sleeper Up Highlander stock at London Euston so it can then work the ECS move to Wembley InterCity Depot (3M16).
The 90lb Dellners require two people to safely lift them into position. The ECS shunt driver is therefore joined by a shunter to assist with this part of the operation.
504
views
1
fave
0
comments
Uploaded on October 15, 2021
Taken on October 14, 2021
Double Lift Dellner
GB Railfreight Class 92, 92014 prepares to attach to the Caledonian Sleeper Up Highlander stock at London Euston so it can then work the ECS move to Wembley InterCity Depot (3M16).
The 90lb Dellners require two people to safely lift them into position. The ECS shunt driver is therefore joined by a shunter to assist with this part of the operation.
504
views
1
fave
0
comments
Uploaded on October 15, 2021
Taken on October 14, 2021