Rain Delay
GB Railfreight Class 92, 92010 races through the rain at Hartford with the Caledonian Sleeper Down Highlander (1S25). The service was 25 minutes late at this point having had a delayed departure from Euston awaiting for catering supplies to be sorted.
1S25 eventually arrived into Inverness 39 Early - in part thanks to additional slack in the timings on a Sunday night for possible engineering works.
Rain Delay
GB Railfreight Class 92, 92010 races through the rain at Hartford with the Caledonian Sleeper Down Highlander (1S25). The service was 25 minutes late at this point having had a delayed departure from Euston awaiting for catering supplies to be sorted.
1S25 eventually arrived into Inverness 39 Early - in part thanks to additional slack in the timings on a Sunday night for possible engineering works.