Nearing The End of a Large Shift
GB Railfreight Class 92, 92043 leads the heavily delayed Caledonian Sleeper Up Lowlander (1M11) through Acton Bridge.
The service was running 144 Late at this point due to issues with joining the stock at Carstairs, which meant it left there 173 Late. There was a further 35 min delay at Penrith awaiting the driver ex-1S26 to take 1M11 back south, however some time was made up and the train arrived into Euston 'only' 96 Late.
Nearing The End of a Large Shift
GB Railfreight Class 92, 92043 leads the heavily delayed Caledonian Sleeper Up Lowlander (1M11) through Acton Bridge.
The service was running 144 Late at this point due to issues with joining the stock at Carstairs, which meant it left there 173 Late. There was a further 35 min delay at Penrith awaiting the driver ex-1S26 to take 1M11 back south, however some time was made up and the train arrived into Euston 'only' 96 Late.