Back to album

Frustrated

GB Railfreight Class 92, 92028 gets back up to speed through Acton Bridge with the Caledonian Sleeper Up Highlander (1M16).

 

The service's progress had been frustrated by Warrington PSB putting out a test train (1Q42) in front of 1M16, with the test train then needing to stop at Warrington for its relief driver. With 1Q42 heading off along the Up Slow at Acton Bridge towards Hartford Junction, 92028 was able to get back up to speed..

 

A revised timetable was in operation due to the Covid-19 pandemic, with two trains running in each direction - one to Inverness and Fort William and the other to Edinburgh - meaning no services to Aberdeen or Glasgow Central.

 

In summary, the uplifted timetable has a Load 14 Highlander serving Inverness (x8) and Fort William (x6) and a Load 8 Lowlander serving Edinburgh only; along with 6 extra coaches being moved as ECS on the Lowlander in each direction twice per week (Southbound Sunday and Wednesday / Northbound Monday and Thursday) to rotate units for maintenance.

1,061 views
3 faves
0 comments
Uploaded on September 3, 2020
Taken on September 2, 2020