Back to gallery

Cleanup day.

After a major winter storm dumped several feet of snow in the Washington Cascades, the iconic Burlington Northern plow that is assigned to the Scenic Sub was brought out to clear the tracks after it was shutdown for over 48 hours due to downed trees, power outages, and trains stalling on the 2.2% grade between Skykomish and Scenic as the heavy "Cascade Cement" caused havoc on the railroads "longshot" planning.

Winton, Washington.

9,647 views
321 faves
27 comments
Uploaded on December 8, 2024
Taken on January 17, 2020