Rio Grande Work Train
Rio Grande 5358 and 5360 pull 10 loads of gravel and 10 loads of rip rap through Lakota Junction, Utah the afternoon of April 18, 1986. These Difco side dumps were loaded on the Pipemill Spur in Vineyard. The material will be used to shore up the right of way in Spanish Fork Canyon.
3,531
views
64
faves
3
comments
Uploaded on February 25, 2020
Taken on April 18, 1986
Rio Grande Work Train
Rio Grande 5358 and 5360 pull 10 loads of gravel and 10 loads of rip rap through Lakota Junction, Utah the afternoon of April 18, 1986. These Difco side dumps were loaded on the Pipemill Spur in Vineyard. The material will be used to shore up the right of way in Spanish Fork Canyon.
3,531
views
64
faves
3
comments
Uploaded on February 25, 2020
Taken on April 18, 1986