The Joys of Winter Railroading
Due to equipment failure via extreme cold temperatures, traffic along Union Pacific's Evanston Sub was at a standstill on Feb. 12, 1994. Two eastbound trains were stopped at Echo, Utah, waiting for traffic ahead to clear and a signal to proceed to Wahsatch summit and beyond.
1,691
views
28
faves
0
comments
Uploaded on April 27, 2017
Taken on February 12, 1994
The Joys of Winter Railroading
Due to equipment failure via extreme cold temperatures, traffic along Union Pacific's Evanston Sub was at a standstill on Feb. 12, 1994. Two eastbound trains were stopped at Echo, Utah, waiting for traffic ahead to clear and a signal to proceed to Wahsatch summit and beyond.
1,691
views
28
faves
0
comments
Uploaded on April 27, 2017
Taken on February 12, 1994