Woodwork Department
Woodwork And Gutters
Board and Batten.jpg
This configuration of panel siding is called board and batten. The board is the panel and the "batts" are typically 1x2 cedar installed on top, spaced every 12" or 16". Then replacing the panel, all batts on top need to be replaced, as well as the frieze board under the soffit.
319
views
0
faves
0
comments
Uploaded on April 4, 2017
Taken on February 3, 2017
Board and Batten.jpg
This configuration of panel siding is called board and batten. The board is the panel and the "batts" are typically 1x2 cedar installed on top, spaced every 12" or 16". Then replacing the panel, all batts on top need to be replaced, as well as the frieze board under the soffit.
319
views
0
faves
0
comments
Uploaded on April 4, 2017
Taken on February 3, 2017