Back to photostream

Firewall clecos

This is the center upper firewall area cleco'ed in place right before the rivets were installed. This whole area was changed from stock to add clearance for the air conditioning system, and to add more area inside the dash.

1,109 views
0 faves
0 comments
Uploaded on March 26, 2009
Taken on March 21, 2009