Acvtrain
Acvtrain
BP SARE @Ashford
BP train SARE heads south through Ashford Junction coming off the third sub with loaded radioactive waste. The set up was different from the usual 1x1 set up, this time with both units up front after 926 stalled attempting to pull loads out of the plant.
630
views
32
faves
1
comment
Uploaded on December 21, 2022
Taken on December 19, 2022
BP SARE @Ashford
BP train SARE heads south through Ashford Junction coming off the third sub with loaded radioactive waste. The set up was different from the usual 1x1 set up, this time with both units up front after 926 stalled attempting to pull loads out of the plant.
630
views
32
faves
1
comment
Uploaded on December 21, 2022
Taken on December 19, 2022