Chapman Rail Photography
Charging the Trash
After picking up 8 loaded trash gondolas from the loader at Yarmouth Transfer Center, GP28 MC 2009 lead the string of 8 just north and clear of the northmost switch at the facility. Depicted here, the conductor throws the switch back to the main near the tail pin of the train, while the engineer kicks the geep into notch 3 to charge and complete required consist brake tests.
Charging the Trash
After picking up 8 loaded trash gondolas from the loader at Yarmouth Transfer Center, GP28 MC 2009 lead the string of 8 just north and clear of the northmost switch at the facility. Depicted here, the conductor throws the switch back to the main near the tail pin of the train, while the engineer kicks the geep into notch 3 to charge and complete required consist brake tests.