Preparing to Head West
After preforming the runaround the engines are on the west end of the train at YA siding. The conductor of the RS71 is finishing up connection the air hoses and once completed the engineer will pull the train out of the siding and the conductor will stand by the switch to line it back to the mainline once clear of the siding.
916
views
19
faves
2
comments
Uploaded on November 18, 2022
Taken on November 14, 2022
Preparing to Head West
After preforming the runaround the engines are on the west end of the train at YA siding. The conductor of the RS71 is finishing up connection the air hoses and once completed the engineer will pull the train out of the siding and the conductor will stand by the switch to line it back to the mainline once clear of the siding.
916
views
19
faves
2
comments
Uploaded on November 18, 2022
Taken on November 14, 2022