Horton-in-Ribblesdale
Like damn, I never been here before
Man up here with the birds give em high fives
60087 'Ingleborough' engaged in the loading process at the newly commissioned Horton-in-Ribblesdale Quarry complex on Thurs 19th June 2025. The locomotive is drawing its train through the conveyor equipped loading shed.
The train will later form the 15.10 departure from the quarry to Tuebrook sdgs, comprising of 22 limestone loaded wagons.
This was the first week of train operation at the quarry, with this being the second train of the week - the first being on 17th June.
Horton-in-Ribblesdale
Like damn, I never been here before
Man up here with the birds give em high fives
60087 'Ingleborough' engaged in the loading process at the newly commissioned Horton-in-Ribblesdale Quarry complex on Thurs 19th June 2025. The locomotive is drawing its train through the conveyor equipped loading shed.
The train will later form the 15.10 departure from the quarry to Tuebrook sdgs, comprising of 22 limestone loaded wagons.
This was the first week of train operation at the quarry, with this being the second train of the week - the first being on 17th June.