single file at Armitage tunnel
The tunnel, which was about 120 metres in length, had its roof removed in 1971 because of subsidence damage being caused by nearby coal mining. A deep narrow cutting remains - wide enough for a single narrowboat to pass through the sandstone.
Near The Plum Pudding pub.
196
views
0
faves
0
comments
Uploaded on July 25, 2011
Taken on July 9, 2011
single file at Armitage tunnel
The tunnel, which was about 120 metres in length, had its roof removed in 1971 because of subsidence damage being caused by nearby coal mining. A deep narrow cutting remains - wide enough for a single narrowboat to pass through the sandstone.
Near The Plum Pudding pub.
196
views
0
faves
0
comments
Uploaded on July 25, 2011
Taken on July 9, 2011