Jacob . Patterson
Timing...
Earlier this year CP ran a CWR train along the Galt Sub dropping rail in various locations before continuing south down the Hamilton Sub. While working their way east, the consist was left tied down on the Killean Storage Track on Galt's east side one evening giving local photographers the opportunity for night shots of the London-built SD40-2.
With the time change 'springing ahead' during the night, I was afforded an extra hour of darkness in the morning, with just enough time to grab a few shots after work before the sun came up.
CP 4WGA
CP 6080, CP 4427
CP Galt Sub - Killean Storage Track
Cambridge, ON.
Timing...
Earlier this year CP ran a CWR train along the Galt Sub dropping rail in various locations before continuing south down the Hamilton Sub. While working their way east, the consist was left tied down on the Killean Storage Track on Galt's east side one evening giving local photographers the opportunity for night shots of the London-built SD40-2.
With the time change 'springing ahead' during the night, I was afforded an extra hour of darkness in the morning, with just enough time to grab a few shots after work before the sun came up.
CP 4WGA
CP 6080, CP 4427
CP Galt Sub - Killean Storage Track
Cambridge, ON.