Brave Workers
Photos from the interpretive sign at the Othello Tunnels showing the early phase of their construction in 1914. The November 2021 flooding of the Coquihalla River (due to the atmospheric rivers that swept over B.C.) has left a lot of damage to this historic site.
888
views
16
faves
0
comments
Uploaded on December 19, 2021
Taken on July 23, 2021
Brave Workers
Photos from the interpretive sign at the Othello Tunnels showing the early phase of their construction in 1914. The November 2021 flooding of the Coquihalla River (due to the atmospheric rivers that swept over B.C.) has left a lot of damage to this historic site.
888
views
16
faves
0
comments
Uploaded on December 19, 2021
Taken on July 23, 2021