Connection

Here is two days after the connection detail was made to tie in the remesh blocks securely to the foundation beam. Thsi small ferrocement detail was covered with a bentonite and water paste with some PVA fibers added to make it somewhat brushable. This bentonite fill of goo helps seal in the moisture for a good cure and the cloth was used to make sure this vulnerable detail stays wet.

615 views
0 faves
0 comments
Uploaded on September 21, 2007
Taken on September 17, 2007