47812 + 755411 - Ely - 01/09/20.
Rail Operations Group (ROG) 47812 is seen at Ely, ready to couple up to Greater Anglia Stadler 755411.
755411 failed at Ely whilst working the 2L77 1350 Peterborough to Ipswich, 47812 was called in to assist the ‘Basil’ and drag it back to Norwich Crown Point Depot. However just minutes after 47812 arrived, 755411 decided to spark back into life – therefore not requiring thunderbird assistance. After around 30 minutes sitting ready to couple up, the 47 was sent ‘0Z99’ back home to Manningtree Down Sidings. 755411 moved back to Norwich CP via Stowmarket under its own power, 5L77 1715 Ely to Norwich CP.
47812 + 755411 - Ely - 01/09/20.
Rail Operations Group (ROG) 47812 is seen at Ely, ready to couple up to Greater Anglia Stadler 755411.
755411 failed at Ely whilst working the 2L77 1350 Peterborough to Ipswich, 47812 was called in to assist the ‘Basil’ and drag it back to Norwich Crown Point Depot. However just minutes after 47812 arrived, 755411 decided to spark back into life – therefore not requiring thunderbird assistance. After around 30 minutes sitting ready to couple up, the 47 was sent ‘0Z99’ back home to Manningtree Down Sidings. 755411 moved back to Norwich CP via Stowmarket under its own power, 5L77 1715 Ely to Norwich CP.