Loco JS6209 Sandaoling 2012
Inbetween mine blasting, when supervisors warn to keep safe distance, the excavation and loading of overburden can be viewed at leisure.
Loco JS6209 is employed on one of the higher levels at West Pit and will soon head for the dump site at Xibolizhan with its spoil load.
17th November 2012
1,137
views
2
faves
2
comments
Uploaded on February 6, 2015
Taken on November 17, 2012
Loco JS6209 Sandaoling 2012
Inbetween mine blasting, when supervisors warn to keep safe distance, the excavation and loading of overburden can be viewed at leisure.
Loco JS6209 is employed on one of the higher levels at West Pit and will soon head for the dump site at Xibolizhan with its spoil load.
17th November 2012
1,137
views
2
faves
2
comments
Uploaded on February 6, 2015
Taken on November 17, 2012