High Line No. 7 Appleby Frodingham Steelworks Scunthorpe
Industrial Loco No 7 complete with loaded wagon on the High Level Railway, serving the mighty blast furnaces of Appleby Frodingham Steelworks Scunthorpe 2nd April 2011. More of the locomotive fleet can be seen in the far distance along this short piece of railway infrastructure. The huge blast furnaces are partially seen to the right of the picture. The photo was taken from one of the brakevans which had been pushed up the incline onto this railway by a steam locomotive operated by the Appleby Frodingham Railway Preservation Society who have a presence on the Steel Works site. The locos on this line continually load up the operating blast furnaces with raw materials for the manufacturing processes in steel making.
High Line No. 7 Appleby Frodingham Steelworks Scunthorpe
Industrial Loco No 7 complete with loaded wagon on the High Level Railway, serving the mighty blast furnaces of Appleby Frodingham Steelworks Scunthorpe 2nd April 2011. More of the locomotive fleet can be seen in the far distance along this short piece of railway infrastructure. The huge blast furnaces are partially seen to the right of the picture. The photo was taken from one of the brakevans which had been pushed up the incline onto this railway by a steam locomotive operated by the Appleby Frodingham Railway Preservation Society who have a presence on the Steel Works site. The locos on this line continually load up the operating blast furnaces with raw materials for the manufacturing processes in steel making.