Back to album

11-0185A

SY1378 2-8-2, SY988 2-8-2 and SY1319 2-8-2 in steam at the main stabling point at Wulong, Fuxin (01/2011)

81 views
0 faves
0 comments
Uploaded on January 14, 2015
Taken on January 10, 2011