93001 works 0Q11 through Shireoaks
The Saturday double this week features two locos at virtually either end of the evolutionary scale............
Since arriving in the UK in 2023, Rail Operations Group's tri-mode (diesel, overhead electric, and battery) 93001 has undergone considerable testing before being released into revenue earning service. It is seen here passing through Shireoaks working 0Q11, the 10.22 light engine move from Derby St. Andrew's Siding to Worksop Down Yard.
93001 works 0Q11 through Shireoaks
The Saturday double this week features two locos at virtually either end of the evolutionary scale............
Since arriving in the UK in 2023, Rail Operations Group's tri-mode (diesel, overhead electric, and battery) 93001 has undergone considerable testing before being released into revenue earning service. It is seen here passing through Shireoaks working 0Q11, the 10.22 light engine move from Derby St. Andrew's Siding to Worksop Down Yard.