Sleepy Eye 09-09-2006
When the DM&E was doing the engineering to expand into the Powder River Basin the company I worked for were in discussion to install the dispatching system and PTC components. Part of my job was to look the railroad over so a proposed Concept of Operations could be developed that would meet the requirements set forth by the customer. Here an Eastbound is passing through Sleepy Eye.
Sleepy Eye 09-09-2006
When the DM&E was doing the engineering to expand into the Powder River Basin the company I worked for were in discussion to install the dispatching system and PTC components. Part of my job was to look the railroad over so a proposed Concept of Operations could be developed that would meet the requirements set forth by the customer. Here an Eastbound is passing through Sleepy Eye.