SNCF Eurostar sets 3201/2 Penge East (#12768)
A London Waterloo to Paris Nord service is seen emerging from Penge Tunnel on 29 August 1997 formed of SNCF e300 sets 3201/2, built in 1992/3 by GEC-Alsthom. In 2022, the railway through Penge Tunnel will be closed for 9 days at the end of July for major renovation works.
1,955
views
17
faves
1
comment
Uploaded on March 15, 2022
Taken on August 29, 1997
SNCF Eurostar sets 3201/2 Penge East (#12768)
A London Waterloo to Paris Nord service is seen emerging from Penge Tunnel on 29 August 1997 formed of SNCF e300 sets 3201/2, built in 1992/3 by GEC-Alsthom. In 2022, the railway through Penge Tunnel will be closed for 9 days at the end of July for major renovation works.
1,955
views
17
faves
1
comment
Uploaded on March 15, 2022
Taken on August 29, 1997