McClure Turn at Haysi Junction
Popping out the south portal of the 331’ McClure Tunnel, a pair of YN2 CW44’s bring 100 coal mtys through Haysi (Berta) Junction enroute to the McClure River Preparation Plant for loading. The old Clinchfield US&S fixture here is the northbound home signal for the junction with the 5.6 mile Haysi Branch just through the tunnel.
September 2, 2021.
1,752
views
84
faves
8
comments
Uploaded on November 5, 2024
Taken on September 2, 2021
McClure Turn at Haysi Junction
Popping out the south portal of the 331’ McClure Tunnel, a pair of YN2 CW44’s bring 100 coal mtys through Haysi (Berta) Junction enroute to the McClure River Preparation Plant for loading. The old Clinchfield US&S fixture here is the northbound home signal for the junction with the 5.6 mile Haysi Branch just through the tunnel.
September 2, 2021.
1,752
views
84
faves
8
comments
Uploaded on November 5, 2024
Taken on September 2, 2021