Back to photostream

McClure Turn at Haysi Junction

Popping out the south portal of the 331’ McClure Tunnel, a pair of YN2 CW44’s bring 100 coal mtys through Haysi (Berta) Junction enroute to the McClure River Preparation Plant for loading. The old Clinchfield US&S fixture here is the northbound home signal for the junction with the 5.6 mile Haysi Branch just through the tunnel.

 

September 2, 2021.

1,752 views
84 faves
8 comments
Uploaded on November 5, 2024
Taken on September 2, 2021