guroleg
TEP70BS diesel locomotive with Ufa-Moscow train (journey time 1 day 5 hours). Chufarovo-Veshkaima stage, Kuybishev railroad, Ulyanovsk region, Russia.
TEP70BS diesel locomotive with Ufa-Moscow train (journey time 1 day 5 hours). Chufarovo-Veshkaima stage, Kuybishev railroad, Ulyanovsk region, Russia.
TEP70BS this locomotive for passenger trains, produced from 2002 at the Kolomna plant (owned by Transmashholding). As of May 2016 it produced 285 cars. His predecessor, TEP70, manufactured in 1973-2006.
2A-5D49 four-stroke diesel, capacity of 4000 hp. Design speed: 160 km/h. The locomotive is equipped with a microprocessor control and diagnosis system.
The body of the locomotive is made of low-alloy steel and aluminum alloys.
TEP70BS diesel locomotive with Ufa-Moscow train (journey time 1 day 5 hours). Chufarovo-Veshkaima stage, Kuybishev railroad, Ulyanovsk region, Russia.
TEP70BS diesel locomotive with Ufa-Moscow train (journey time 1 day 5 hours). Chufarovo-Veshkaima stage, Kuybishev railroad, Ulyanovsk region, Russia.
TEP70BS this locomotive for passenger trains, produced from 2002 at the Kolomna plant (owned by Transmashholding). As of May 2016 it produced 285 cars. His predecessor, TEP70, manufactured in 1973-2006.
2A-5D49 four-stroke diesel, capacity of 4000 hp. Design speed: 160 km/h. The locomotive is equipped with a microprocessor control and diagnosis system.
The body of the locomotive is made of low-alloy steel and aluminum alloys.