tquist24
Morro Bay (7) - Solar Power
From Wikipedia regarding this power plant: "The Dynegy power plant, previously owned by Pacific Gas and Electric Co.(PG&E), Duke Energy, and LSPower (PG&E), has played a large role in Morro Bay, and in providing electricity to the Central Coast and the Central Valley of California (primarily Fresno and Bakersfield). The plant was built in the 1950s, and Dynegy had hoped to modernize it with a new combined cycle plant. The plant was operating at relatively low capacity factors (approximately 5%) under contract with PG&E, due primarily to economics. The plant was staffed with 44 employees. A portion of the city's budget came from taxes on the natural gas the plant burned. The United States Environmental Protection Agency (EPA) and the courts are wrestling with how to interpret the Clean Water Act (CWA) and its applicability to power plants. The EPA has ruled that the local Regional Water Quality Control Boards are responsible for ensuring that the current and the future plant are permitted and regulated.[citation needed]
The modernization proposal was rejected, and the plant closed in February 2014.[37] Continued operation would have required expensive upgrades by 2015. The 650-megawatt plant operated around the clock during the energy crisis of 2000, but the plant had been operating at just one-sixth of that capacity in the recent years preceding its closure.[38] Future uses of the site and/or plant are undetermined, as of December 2016.
In 2018, a joint venture of German energy company EnBW and Seattle-based Trident Winds announced its plan to obtain the power plant's grid connection to connect a 650 MW floating offshore wind park comprising up to 100 floating wind turbines and a floating substation situated some 30 mi (48 km) off the coast.[39]." See: en.wikipedia.org/wiki/Morro_Bay,_California
Morro Bay (7) - Solar Power
From Wikipedia regarding this power plant: "The Dynegy power plant, previously owned by Pacific Gas and Electric Co.(PG&E), Duke Energy, and LSPower (PG&E), has played a large role in Morro Bay, and in providing electricity to the Central Coast and the Central Valley of California (primarily Fresno and Bakersfield). The plant was built in the 1950s, and Dynegy had hoped to modernize it with a new combined cycle plant. The plant was operating at relatively low capacity factors (approximately 5%) under contract with PG&E, due primarily to economics. The plant was staffed with 44 employees. A portion of the city's budget came from taxes on the natural gas the plant burned. The United States Environmental Protection Agency (EPA) and the courts are wrestling with how to interpret the Clean Water Act (CWA) and its applicability to power plants. The EPA has ruled that the local Regional Water Quality Control Boards are responsible for ensuring that the current and the future plant are permitted and regulated.[citation needed]
The modernization proposal was rejected, and the plant closed in February 2014.[37] Continued operation would have required expensive upgrades by 2015. The 650-megawatt plant operated around the clock during the energy crisis of 2000, but the plant had been operating at just one-sixth of that capacity in the recent years preceding its closure.[38] Future uses of the site and/or plant are undetermined, as of December 2016.
In 2018, a joint venture of German energy company EnBW and Seattle-based Trident Winds announced its plan to obtain the power plant's grid connection to connect a 650 MW floating offshore wind park comprising up to 100 floating wind turbines and a floating substation situated some 30 mi (48 km) off the coast.[39]." See: en.wikipedia.org/wiki/Morro_Bay,_California