OberonBlue
W.G. Nagel Photography_.IMG_5369369
In 2005, a £500 million restoration plan was announced by Network Rail; it was approved by Camden London Borough Council on 9 November 2007.[17] The plan includes a thorough restoration and reglazing of the arched roof of the original station and the removal of the cramped and congested 1972 extension, to be replaced by an open-air plaza, scheduled for completion in 2013.[18][19]
A new semi-circular departures concourse, opened to the public on 19 March 2012,[20][21] has been built in the space directly to the west of the station behind the Great Northern Hotel, some outbuildings of which have been demolished. Designed by John McAslan and built by Vinci,[22] it is intended to cater for much-increased passenger flows and provide greater integration between the intercity, suburban and underground sections of the station, facilitating interchange between King's Cross and St Pancras. Departing passengers use the new concourse; arriving passengers initially exited the station from the old concourse on Euston Road, but now go through the new public square. The architect claims that the roof is the longest single-span station structure in Europe. The semi-circular building has a radius of 54 metres and over 2,000 triangular roof panels, half of which are glass.[18]
The steel structure of the roof, engineered by Arup, has been described as being "like some kind of reverse waterfall, a white steel grid that swoops up from the ground and cascades over your head".[18]
The land between and behind the two stations is being redeveloped with nearly 2,000 new homes, 486,280 m2 (5,234,000 sq ft) of offices and new roads as King's Cross Central.
As part of this restoration programme, refurbished offices have opened on the east side of the station to replace the ones lost on the west side, and a new platform 0 opened underneath them on 20 May 2010. To prevent exhaust fumes from entering the ventilation system, no diesel trains are permitted to use this platform. The platform occupies the space of a former taxi rank, and was originally to be known as platform Y, but was renamed to avoid the confusion of having both lettered and numbered platforms. When the refurbishment is complete, all the platforms will be renumbered, the new one becoming platform 1.[23] Although there have been plans for a new platform for some time to increase capacity, it was the need to minimise disruption during restoration when other platforms would be temporarily out of use that led to this being built.
The restoration project was awarded a European Union Prize for Cultural Heritage / Europa Nostra Award in 2013.[24
W.G. Nagel Photography_.IMG_5369369
In 2005, a £500 million restoration plan was announced by Network Rail; it was approved by Camden London Borough Council on 9 November 2007.[17] The plan includes a thorough restoration and reglazing of the arched roof of the original station and the removal of the cramped and congested 1972 extension, to be replaced by an open-air plaza, scheduled for completion in 2013.[18][19]
A new semi-circular departures concourse, opened to the public on 19 March 2012,[20][21] has been built in the space directly to the west of the station behind the Great Northern Hotel, some outbuildings of which have been demolished. Designed by John McAslan and built by Vinci,[22] it is intended to cater for much-increased passenger flows and provide greater integration between the intercity, suburban and underground sections of the station, facilitating interchange between King's Cross and St Pancras. Departing passengers use the new concourse; arriving passengers initially exited the station from the old concourse on Euston Road, but now go through the new public square. The architect claims that the roof is the longest single-span station structure in Europe. The semi-circular building has a radius of 54 metres and over 2,000 triangular roof panels, half of which are glass.[18]
The steel structure of the roof, engineered by Arup, has been described as being "like some kind of reverse waterfall, a white steel grid that swoops up from the ground and cascades over your head".[18]
The land between and behind the two stations is being redeveloped with nearly 2,000 new homes, 486,280 m2 (5,234,000 sq ft) of offices and new roads as King's Cross Central.
As part of this restoration programme, refurbished offices have opened on the east side of the station to replace the ones lost on the west side, and a new platform 0 opened underneath them on 20 May 2010. To prevent exhaust fumes from entering the ventilation system, no diesel trains are permitted to use this platform. The platform occupies the space of a former taxi rank, and was originally to be known as platform Y, but was renamed to avoid the confusion of having both lettered and numbered platforms. When the refurbishment is complete, all the platforms will be renumbered, the new one becoming platform 1.[23] Although there have been plans for a new platform for some time to increase capacity, it was the need to minimise disruption during restoration when other platforms would be temporarily out of use that led to this being built.
The restoration project was awarded a European Union Prize for Cultural Heritage / Europa Nostra Award in 2013.[24