Descending the Claypool Loops
CSX mine run R202 has 60 loads of fresh coal from Clearco Mine making the steep descent towards the New River mainline at Meadow Creek, WV. Along with setting retainers on 30% of the train and using two horseshoes in an attempt to ease the gradient its still a stiff slope that reaches 3.8% in places.
1,490
views
28
faves
0
comments
Uploaded on September 12, 2023
Taken on September 4, 2023
Descending the Claypool Loops
CSX mine run R202 has 60 loads of fresh coal from Clearco Mine making the steep descent towards the New River mainline at Meadow Creek, WV. Along with setting retainers on 30% of the train and using two horseshoes in an attempt to ease the gradient its still a stiff slope that reaches 3.8% in places.
1,490
views
28
faves
0
comments
Uploaded on September 12, 2023
Taken on September 4, 2023