Step one was to build a heavy duty shore wall over the entry porch area where columns were the most severely deteriorated; when each column was removed temporary 4 x 4 supports were added on either side. Jacking slightly allowed removal of column and base and then the column was laid on a worktable for paint stripping and repairs, All defects were filled, sanded smooth followed by primer paint. New rot resistant bases were added at the bottoms of the columns and they were reinstalled in original locations. Original column finish color was determined and then matched. See more...
2222 Faraon 2 St Joe
Step one was to build a heavy duty shore wall over the entry porch area where columns were the most severely deteriorated; when each column was removed temporary 4 x 4 supports were added on either side. Jacking slightly allowed removal of column and base and then the column was laid on a worktable for paint stripping and repairs, All defects were filled, sanded smooth followed by primer paint. New rot resistant bases were added at the bottoms of the columns and they were reinstalled in original locations. Original column finish color was determined and then matched. See more...