ramalama_22
ramalama_22
LA Regional Connector - Deadly Slow Pace - 6 Months of Trench Digging
View west towards Alameda Street along First Street. A small part of the trench has been excavated a few feet down. The portal to the future station across Alameda Street looks about 40 feet lower.
The steel soldier columns were in place 6 months ago.
351
views
0
faves
0
comments
Uploaded on October 28, 2018
Taken on October 27, 2018
LA Regional Connector - Deadly Slow Pace - 6 Months of Trench Digging
View west towards Alameda Street along First Street. A small part of the trench has been excavated a few feet down. The portal to the future station across Alameda Street looks about 40 feet lower.
The steel soldier columns were in place 6 months ago.
351
views
0
faves
0
comments
Uploaded on October 28, 2018
Taken on October 27, 2018