Current Work Sight
After the sales office is gone, the next step is to cover the surface of the sight with reinforced concrete, I guess it is about 30 centimeters thick (1 ft.). The whole surface is covered except for 1 meter wide slots all around the edge and a "well" in the middle. These slots are trenched out to a depth of 28 - 36 meters according to the sight foreman who talked to me. The rebar is welded into 28 - 36 meter tall cages and lowered into the slots. There were three cranes on the sight Kobelco (aqua) Hitachi (orange) and a hybrid of both manufacturers. All the cranes are Japanese.
Current Work Sight
After the sales office is gone, the next step is to cover the surface of the sight with reinforced concrete, I guess it is about 30 centimeters thick (1 ft.). The whole surface is covered except for 1 meter wide slots all around the edge and a "well" in the middle. These slots are trenched out to a depth of 28 - 36 meters according to the sight foreman who talked to me. The rebar is welded into 28 - 36 meter tall cages and lowered into the slots. There were three cranes on the sight Kobelco (aqua) Hitachi (orange) and a hybrid of both manufacturers. All the cranes are Japanese.