Back to photostream

Current Work Sight

After the sales office is gone, the next step is to cover the surface of the sight with reinforced concrete, I guess it is about 30 centimeters thick (1 ft.). The whole surface is covered except for 1 meter wide slots all around the edge and a "well" in the middle. These slots are trenched out to a depth of 28 - 36 meters according to the sight foreman who talked to me. The rebar is welded into 28 - 36 meter tall cages and lowered into the slots. There were three cranes on the sight Kobelco (aqua) Hitachi (orange) and a hybrid of both manufacturers. All the cranes are Japanese.

202 views
0 faves
0 comments
Uploaded on July 17, 2007
Taken on June 17, 2007