Back to photostream

Utah Railway Mainline

A morning Utah Railway Intermountain Power empty heads for the WildCat Load-Out. This was the last active coal loading facility on the Utah Railway mainline. The load-out closed in 2015. There was oil loading going on at the load-out location, this too has ceased. Sad times on the Utah Railway.....

3,251 views
108 faves
9 comments
Uploaded on April 29, 2016