Sanding Solider Summit
A heavy westbound coal load climbs heavy grade that reaches 3%+ in this spot. The sound of the assault could be heard several minutes in advance of the freight as wheel slip control and the deep thrub of Union Pacific GE AC locomotives reverberate off the tight canyon walls. March 2012. Price River Canyon Utah DRGW UP Union Pacific
2,394
views
63
faves
4
comments
Uploaded on October 30, 2015
Sanding Solider Summit
A heavy westbound coal load climbs heavy grade that reaches 3%+ in this spot. The sound of the assault could be heard several minutes in advance of the freight as wheel slip control and the deep thrub of Union Pacific GE AC locomotives reverberate off the tight canyon walls. March 2012. Price River Canyon Utah DRGW UP Union Pacific
2,394
views
63
faves
4
comments
Uploaded on October 30, 2015