FAROOQ RASHEED ANSARI BABA GE
Drag to set position!
IF ANY PERSON NEED FREE CONSULTANCY AND TREAINING FOR ANY DEPARMENT OF HDPE PIPE PRODUCTION UNIT
( PRODUCTION, QUALITY, MAINTENANCE, DOCUMENTATION )
FEEL FREE AND CONTACT ME
Name: FAROOQ RASHEED
S/o. ABDUL RASHEED
C.N.I.C. No. 35102-0695802-3
PASSPORT No: AK9848022
Phone NO +9249-2772817
Mobile No +923074744440
Res. Mohallah Dinggi Pura Muslim Masjid
Lahore Road Kasur. PUNJAB, PAKISTAN
Email:
Farooq.Rasheed.Ansari@Gmail.com ( Google Talk )
Farooq_Rasheed_Ansari@yahoo.com ( Yahoo Messenger )
SKYPE
FAROOQ.RASHEED.ANSARI
LINKEDIN:
pk.linkedin.com/in/farooqrasheedansari
FACEBOOK:
www.facebook.com/FAROOQ.RASHEED.ANSARI
CV DOCUMENTS:
www.box.com/s/eamos8z3vs3zgxm4udzn
Curriculum Vitae
(Plc & Automation Specialist for Plastic Pipe Industries)
(PLASTIC PIPE SPECIALIST- PRODUCTION, QUALITY, MAINTENANCE)
FAROOQ RASHEED ANSARI FROM PAKISTAN
SUMMARY
22 Years’ Experience
16 Years’ working Experience in HD / MD / LD / PE, PPR, COD, PIPE Production Line
Also have Production and Quality Experience, of STC, ZAIN, MOBILY, SE CO, SASO, GSO, DIN, ISO, water, spiral, COD, PPRC, HDPE, LDPE, Micro-Duct, Electrical and Telecom Conduit Pipes etc.
Experience as Production Manager, Qc Manager, Plc & Automation, Maintenance Manager, At Different Plastic PIPE Production Units
Experience with (24 mm to 1200 mm PIPE Size Gas & Water) Many Different Extruder Like
Jwell
battenfeld-cincinnati
Jinhu
Kabra Extruder
Fangli, Etc
KraussMaffei
BASAR MAKINA
SICA
MARKEM IMAJE
TECNOMATIC
DAKUMAR
BEIER EXTRUDER
CONPRO. Gravimetric System
Inoex Saveomat M2 Automatic Wall Thickness & Weight Controller.
Mechanical Maintenance Complete Extruder Line Any Size (Vacuum Unit, Vacuum Pump, Showering Unit, Water Pump, Sleeve, Die, Cutter, Haul- Off Unit Etc.)
Electrical Maintenance (Star Delta Motor, Power Factor, Chiller, Electric Generator, Synchronizer Panel. Generator AVR, Etc. Installation and Maintenance of Ac and Dc Motor Drive)
Chilling Unit Maintenance (Cooling Tower Chiller Gas Filling Etc.)
PLC (Extruder PLC, Cutter PLC, Puller PLC, Pneumatic, PLC HMI. Etc.)
Computer (Extruder PLC Computer HMI, Computer Net Working, Computer Hardware Engineering Computer Lab Software Installation, Printer, Scanner, Maintenance Etc.)
Electronics (Dc, Ac Drives, Electronics Card, PLC Modules, Like DCS 400 Dc Drive Field Exiting Card Repairing).
Cij- Ink Jet Printer & Emboss Printer for PIPE (Maintenance & Management)
Crushing Units (Maintenance & Manage)
Air Compressor (Maintenance & Manage)
Air Dryer (Maintenance & Manage)
Electro-Pneumatic Control (Maintenance & Manage)
SAP & ORACLE ERP NETSUITE
LEAN SIX SIGMA
6S
Experience
Top to Bottom
HOD, Production, Manager
TURKPLAST PAKISTAN
PAKISTAN
Time Period: 20-1-2019 to till now
Company Name: Alif industry (Turkplast) www.alifindustry.com
Designation: HOD (Production Manager)
Job Description
• Control all production as well as planning on Extrusion base technology from Germany and Italy and Chinese for PPRC, HDPE PE100, PE80 from all SDR and PN with Dia ranging from 20 mm to 630 mm as per the quality standards of ISO 4427, 4437, 15874, DIN 8074, 8077 Etc.
• To manage efficiently the reprocessing unit with grinding of scrap, pelletizing and agglomeration in the plant for HDPE, MDPE, PPRC pipes, and bags as well as meeting of the monthly production targets.
• To prepare the production plan and accordingly coordinate with the shift supervisors.
• To schedule the required manpower for the production and ensuring the maximum utilization.
• To Supervising Shift Supervisors, Operators & Maintenance Technicians directly.
• To prepare and manage all documentation for the production.
• To prepare the daily production reports to Operation Manager/company management.
• To manage and direct the shift supervisors and Operators for the proper running of the machines.
• To liaise with the maintenance department and tool room on any matters that may affect the production.
• To monitor the tooling is kept in a proper manner and correct tools are issued for each job.
• To monitor product standards and implement the Quality Management system being followed.
• To keep proper and confidential records on formulas, tooling and all matters related to production.
• To work as team with QAD and ensure the test and inspection requirements are met.
• To ensure and advise the training and upgrading of the skills of the supervisors and operators so they have full knowledge of all the machines and the quality standards.
• To undertake as necessary and record any corrective / preventive actions.
• To ensure factory is kept clean and tidy at all times.
• To make sure all the Health and Safety requirements are followed.
• To monitor the safe keeping of company assets such as machinery, tools and all equipment in the factory.
• To coordinates with every department related to production activities.
• To implement the quality control program which make sure the continuous improvement of the quality of the products, operations and environment.
Time Period: 21-2-2015 to Till Now
Company Name: ALMONA PLASTIC RIYADH www.almonaplast.com/
HDPE, PPRC, MICRO DUCT, COD, PIPE Maker Specially STC and MOBILY Telecom Pipe
Designation: Production & Maintenance Manager
Job Description
Production & Quality
Also have Production and Quality Experience, of STC, ZAIN, MOBILY, SE CO, SASO, DIN, ISO, water, spiral, COD, PPRC, HDPE, LDPE, Micro-Duct, Electrical and Telecom Conduit Pipes etc.
Ensure Production of PIPE in Accordance With Company Policy, ISO 4427 And Any Other Standard As Determined By Management From Time To Time - Regular Production Planning To Minimize Downtime And Scrap - Ensure Training is Provided To Supporting Production Staff in The Proper Operation And Maintenance of The Machine - Creation And Maintenance of Detailed Operation Manual For Extrusion Machine And Associated Components (Hopper, Chiller Units Etc.) - Completion of Production Related Reports in Accordance With Management And ISO Requirements (E.G. Daily Production Report, PIPE Production Reports, Batch Data, Maintenance Records, Raw Material Reports) - Maintenance of Extrusion Machine And All Associated Components. - Ensure Any Repairs Required And Approved By Management Are Quickly And Efficiently Carried Out To Minimize Machine Downtime - Ensure Production Area Is Kept Clean And Organized - Report Any QHSE Issues Through Use of CPAR Forms - Communicate Possible Cost Minimization Strategies - Assist Factory Manager in Staff Allocations According To Production Requirements. - Ensure Quality of Products Produced. - Assist Management in Devising Future Strategy.
Plc Automation, Electrical, Mechanical
Documentation According to ISO Standards 9001-2005 Related to Maintenance and preparing and following the maintenance schedule
Plc Automation and electrical:
Installation and Maintenance & Programming & Automation Of
Ac & Dc motor Drive,
Star Delta Motor,
Power Factor (Lt),
Electrical main distribution panel,
Water Chiller,
Electric Generator and
Synchronizer Panel,
Generator AVR Etc.
Extruder PLC,
Cutter PLC,
Puller PLC,
Automation,
pneumatic,
all type of HMI.
Computer Net Working,
Computer Hardware Engineering,
Computer server system
Cctv system,
Pabx and VoIP pbx telephone Exchange system
Electronics (Dc, Ac Drives, Electronics Card, PLC Modules, Like DCS 400 Dc Drive Field Exiting Card Repairing)
Encoder, pipe length counter
Gravimetric weighing systems.
Plc Automation with a pneumatic system of a cutter, haul off, vacuum tank, winder, extruder, plastic recycling system, dryer, Etc
Programming of standalone temperature controlled & Gfx-4 and gfx-S2, SSR
Gfx-4 and gfx-S2, SSR
Cij- Ink Jet Printer & Emboss Printer for PIPE
Mechanical:
Vacuum Unit, Vacuum Pump, Showering Unit, Water Pump, Sleeve, Die, Cutter, Haul-Off Unit Etc.
Time Period: 14-11-2011 to 15-08-2014
Company Name: NEWTECH PIPE newtech-pipes.com/
Maker of PE, PPR, PVC PIPE (From 25 mm to 1200 mm) (Siemens PLC 200 S7 Based)
Designation: Production & Maintenance Manager
Job Description
Plc Automation, Electrical, Mechanical
Documentation According to ISO Standards 9001-2005 Related to Maintenance and preparing and following the maintenance schedule
Plc Automation and electrical:
Installation and Maintenance & Programming & Automation Of
Ac & Dc motor Drive,
Star Delta Motor,
Power Factor (Lt),
Electrical main distribution panel,
Water Chiller,
Electric Generator and
Synchronizer Panel,
Generator AVR Etc.
Extruder PLC,
Cutter PLC,
Puller PLC,
Automation,
pneumatic,
all type of HMI.
Computer Net Working,
Computer Hardware Engineering,
Computer server system
Cctv system,
Pabx and VoIP pbx telephone Exchange system
Electronics (Dc, Ac Drives, Electronics Card, PLC Modules, Like DCS 400 Dc Drive Field Exiting Card Repairing)
Encoder, pipe length counter
Gravimetric weighing systems.
Plc Automation with a pneumatic system of a cutter, haul off, vacuum tank, winder, extruder, plastic recycling system, dryer, Etc
Programming of standalone temperature controlled & Gfx-4 and gfx-S2, SSR
Gfx-4 and gfx-S2, SSR
Cij- Ink Jet Printer & Emboss Printer for PIPE
Mechanical:
Vacuum Unit, Vacuum Pump, Showering Unit, Water Pump, Sleeve, Die, Cutter, Haul-Off Unit Etc.
Production & Quality
Also have Production and Quality Experience, of, SASO, DIN, ISO, water, spiral, COD, PPRC, HDPE, LDPE, Micro-Duct, Electrical and Telecom Conduit Pipes etc.
Ensure Production of PIPE in Accordance With Company Policy, ISO 4427 And Any Other Standard As Determined By Management From Time To Time - Regular Production Planning To Minimize Downtime And Scrap - Ensure Training is Provided To Supporting Production Staff in The Proper Operation And Maintenance of The Machine - Creation And Maintenance of Detailed Operation Manual For Extrusion Machine And Associated Components (Hopper, Chiller Units Etc.) - Completion of Production Related Reports in Accordance With Management And ISO Requirements (E.G. Daily Production Report, PIPE Production Reports, Batch Data, Maintenance Records, Raw Material Reports) - Maintenance of Extrusion Machine And All Associated Components. - Ensure Any Repairs Required And Approved By Management Are Quickly And Efficiently Carried Out To Minimize Machine Downtime - Ensure Production Area Is Kept Clean And Organized - Report Any QHSE Issues Through Use of CPAR Forms - Communicate Possible Cost Minimization Strategies - Assist Factory Manager in Staff Allocations According To Production Requirements. - Ensure Quality of Products Produced. - Assist Management in Devising Future Strategy.
Time Period: 01-01-2004 to 15-01-2011
Company Name: Hi-Tech PIPE & Engineering Industries Kasur Pakistan www.hitechpipe.com.pk
Maker of PE, PPR, PVC PIPE (From 25 mm to 1200 mm) (Siemens PLC 200 S7 Based)
Designation: MAINTENANCE MANAGER
Job Description
Plc, Electrical, Mechanical
Documentation According to ISO Standards 9001 Related to Maintenance and preparing and following the maintenance schedule
Installation and Maintenance & Programming & Automation Of
Ac & Dc motor Drive,
Star Delta Motor,
Power Factor (Lt),
Electrical main distribution panel,
Water Chiller,
Electric Generator and
Synchronizer Panel,
Generator AVR Etc.
Extruder PLC,
Cutter PLC,
Puller PLC,
Automation,
pneumatic,
all type of HMI.
Computer Net Working,
Computer Hardware Engineering,
Computer server system
Cctv system,
Pabx and VoIP pbx telephone Exchange system
Electronics (Dc, Ac Drives, Electronics Card, PLC Modules, Like DCS 400 Dc Drive Field Exiting Card Repairing)
Encoder, pipe length counter
Gravimetric weighing systems.
Plc Automation with a pneumatic system of a cutter, haul off, vacuum tank, winder, extruder, plastic recycling system, dryer, Etc
Programming of standalone temperature controlled & Gfx-4 and gfx-S2, SSR
Gfx-4 and gfx-S2, SSR
Cij- Ink Jet Printer & Emboss Printer for PIPE
Mechanical:
Vacuum Unit, Vacuum Pump, Showering Unit, Water Pump, Sleeve, Die, Cutter, Haul-Off Unit Etc.
Production & Quality
Also have production & Qc experience of hdpe 20 to 1200 mm and COD & pprc pipe production
Time Period: 1996 - 2004
Company Name: Midas Chemical Industries Ltd. Kasur. Pakistan (Acetic Acid (Glacial) Manufacturer Petrochemical Plant PLC (ABB) Base)
Designation: : PLC, & Instrumentation Engineer
Job Description:
Installation And Maintenance and Programing ABB Plc & Instrumentation ( instruments related to level, flow, pressure, temperature Etc. )
Designing, Calibration Maintenance & Preventive Maintenance & Documentation According To ISO Standards 9001 Related To PLC, Instrumentation, Electrical Department Like PLC Programmer and Designer Installation & Calibration of Level, Pressure, Flow, Temperature, Etc. Instruments
Education & Qualification
Matriculation 1994
Technical Education
01. Diploma in Electronics (2 Years 1994 to 1996) (German syllabus under German management)
Diploma in Electronics (Rtv) From TEVTA (Technical Education & Vocational Training Authority Pakistan) Technical Training Institute Kasur
02. M. C. T (Master Craftsman) (2001 To 2003) (German syllabus under German management)
Electrical & Electronics & PLC & Pneumatic, Etc. At G.1 Level 2001 To 2003From S.T.I TEVTA (Staff Training Institute, Technical Education & Vocational Training Authority Pakistan) Gulberg Lahore, Punjab, Pakistan
Subjects
01. P.L.C, DCS and SCADA Systems
02. Digital Techniques & Electronics Circuits
03. Automation (P.I.D. Controller)
04. Instrumentation & Process Control
05. Power Electronics
07. Micro Processor System
08. Operational Amplifier System
09. Electro-Pneumatic
10. Three Phase Motors
11. Three Phase Supply
12. Dc Motors
13. Ups (uninterruptible power supply)
14. Cooling System (Chiller)
15. Ac Drive, Dc Drive
18. Organization Behavior & Management
19. Power Factor
15. Ac Drive, Dc Drive
18. Organization Behavior & Management
19. Power Factor
20. Pneumatic & electro Pneumatics
03. Atmel 8051 Micro Controller Programming & Its Application
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
04. AutoCAD Electrical
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
05. Instrumentation & Process Control
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
06. Air - Conditioning & Refrigeration
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
07. Injection Molding
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
08. PIPE Designing
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
10. Engineering Draughting
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
11. Basic Welding
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
Subject
01.Metal Welding,
02.Plastic Welding,
03.PPR,
04.PVC,
05.PE,
06.Type Of Fittings,
07.Type Of Instruments,
08.Drawing ,
09.Terms And Symbols In Piping,
10.Quality ,
11.Inspection,
12.Safety Etc.
Tig Welding
From PITAC (Pakistan Industrial Technical Assistance Center) Lahore, Punjab, Pakistan
Computer Education
01. Microsoft Certified Solutions Expert (MCSE)
From Corvit Systems (Pvt.) Ltd. Lahore
02. Computer Networking Solution
From. Brains College of IT& H.E. Lahore
03. Computer Hardware Engineering
From. Brains College of IT& H.E Lahore
04. Master in Microsoft Office
From. Brains College of IT& H.E Lahore
05. Laptop Computer Hardware Engineering
From. Brains College of IT& H.E Lah
Contact information
Name: Farooq Rasheed
S/O. Abdul Rasheed
C.N.I.C. O. 35102-0695802-3
Passport No: Ak9848023
D.O.B: 06-01-1979
Mobile No +923074744440
Res. Mohallah Dinggi Pura Muslim Masjid
Lahore Road Kasur. Punjab, Pakistan
Email: Farooq.Rasheed.Ansari@Gmail.Com (Google Talk),
Linkedin: Http://Pk.Linkedin.Com/In/Farooqrasheedansari ,
Facebook: Http://Www.Facebook.Com/Farooq.Rasheed.Ansari
SkyPE: Farooq.Rasheed.Ansari ,
WhatsApp, Line, Viber, 00923074744440
- JoinedJuly 2012
Testimonials
Nothing to show.