Back to photostream

Pour, smooth, repeat

Crews have to pour the deck slowly and carefully, smoothing the concrete as they go. The deck span is 160 feet long.

7,398 views
7 faves
0 comments
Uploaded on September 10, 2013
Taken on September 10, 2013