A future ramp to I-5 in Kent, WA
In Kent, WA, workers build a ramp to Interstate 5. After building the wall by inserting soil nails, installing rebar, and adding cement, workers begin working on the roadway. The crew uses excavators to remove the soil, even out the roadway and create a trench that will be used for drainage.
The round structure by the right wall will be used to access the drainage system from the surface. This work is a part of the State Route 509 Completion project, which connects SR 509 to I-5 and improves the I-5/SR 516 interchange and local roads.
The SR 509 Completion project is part of the Puget Sound Gateway program, which completes the missing links in Washington state's highway and freight network.
A future ramp to I-5 in Kent, WA
In Kent, WA, workers build a ramp to Interstate 5. After building the wall by inserting soil nails, installing rebar, and adding cement, workers begin working on the roadway. The crew uses excavators to remove the soil, even out the roadway and create a trench that will be used for drainage.
The round structure by the right wall will be used to access the drainage system from the surface. This work is a part of the State Route 509 Completion project, which connects SR 509 to I-5 and improves the I-5/SR 516 interchange and local roads.
The SR 509 Completion project is part of the Puget Sound Gateway program, which completes the missing links in Washington state's highway and freight network.