Back to photostream

Compiled changes to the gym

Some great stuff got done by our volunteer corps this week, still got lots of work for the big changes though ahead. The lab wall is now fully sheeted in 3/4" ACX and drastically reinforced, close to the strongest wall in the gym. The windows now have our trim design with rounded over edges and ......http://blog.parkourvisions.org/compiled-changes-to-the-gym Posted via web from Parkour Visions miniBlog

1,969 views
0 faves
0 comments
Uploaded on March 28, 2010