Hand>MultiClamp+Platform_Proposal_Costain_Holyhead001-Copy

This sketch is a complicated version of a plan, to show where the working platform runs will be positioned in relation to the structural steel grid and temporary and permanent piles.

The grid is acting as a Piling Frame, in conjunction with the indicated vertical temporary piles.

This was probably drawn over a squared 'ghost' sheet (5mm squares) underneath with a 0.5mm Fibretip pen for the drawing and a 0.3mm Fibretip for the Text Lettering.

The section lines relate to 2 sections shown on another drawing.