View allAll Photos Tagged 2'

Leica M8.2 + Summilux-M 50mm f/1.4 ASPH

Nikon Fm/Nikkor 24@f2.8

 

Oh, and just in case you wonder why #2, here is #1: www.flickr.com/photos/gatolopez/481415169/in/set-72157600...

C:\Users\550195.FLITECHCAW\Desktop\Larrys Pix\Wave2-ST\Wave2-ST-2.jpg

A comparison of the cheap film scan (left) and the 8mp scan (right).

 

I'm reckoning the intended exposure was towards the 8mp scan, as there is detail in the shadows that cannot be regained in the cheaper scan

As before, the crop the machine has produced has shifted a reasonable amount.

 

The original upload to Flickrflic.kr/p/nHP2Rr

2015 GP2 Series Round 7.

Spa-Francorchamps, Spa, Belgium.

Sunday 23 August 2015.

Alexander Rossi (USA, Racing Engineering)

Photo: Zak Mauger/GP2 Series Media Service.

ref: Digital Image _L0U4380

2º TomarLego exhibition by 0937 Community

Hi

My Name is graphichome9. I am a professional Graphic Designer in fiverr. Exprience in any Business Related (Beauty Product, Car Raintal, Real Esate,Lawer, Parsonal,USA Business,) Mordran,Professional, Creative, Corporate, Amazing, Outstanding Unique Business Card Design.

 

Features:

Corporate Business Card

Adobe Illustrator CC 2018

Adobe Photoshop CC 2018

Print Ready (PSD,PNG,PDF,JPEG,Mockup JPEG File)

All File Vector File Format

300 DPI

Standard Size 3.5 x 2 inches (0.25" Bleed Area)

CMYK color

Free font

Ready to Print

 

Front:

Lato Font Family

 

Regards

graphichome9

Ein letzter Blick auf CryoSat-2, bevor der Satellit Ende 2009 zum Start nach Baikonur transportiert werden soll.

It was a Foggy night when The Biggest and Massive Cruise Ship arrives in Saint John,Oct.2005...its a Delightful Sight .....and a Lovely Ship.

 

Length: 345 meters / 1132 feet

Beam: 40 meters / 135 feet

Beam at Bridge Wings: 45 meters / 147.5 feet

Draft: 10 meters / 32 feet 10 inches

Height (Keel to Funnel): 72 meters / 236.2 feet

Gross Registered Tonnage: Approximately 150,000 gross tons

Passengers: 2620

Crew: 1253

Top Speed: Approximately 30 knots (34.5 mph)

Power: 157,000 horsepower, Environmentally friendly, gas turbine/diesel electric plant

Propulsion: Four pods of 20 MW each. 2 fixed and 2 azimuthing.

Strength: Extra thick steel hull for strength and stability for Transatlantic Crossings.

Stabilizers: Two sets

Cost: Estimated $800 million dollars

 

Ensayos para el programa 2 de SE LLama Copla Junior

The water is higher and the shores greener - partly because levels in the lake have recovered from the all time low of 2009, but also because this is the end of the long rains.

 

In contrast to this parts of east africa are currently experiencing the worst drough in Decades. Somalia, Sudan and northern parts of Kenya have not had the rains for 2 years, resulting in failed harvests, soaring food prices and displacement of people.

 

As I returned (Jul 2010) the size of the crisis was just beginning to make the news.

1 2 ••• 57 58 60 62 63 ••• 79 80