Reston Pedestrian
Reston Pedestrian
Map of The High Line Access Points
DESIGN TEAM:
James Corner Field Operations will oversee phase 2 of development (from 20th to 30th streets) which is scheduled to be completed Spring 2011:
Piet Oudolf: Planting Designer
Diller Scofidio + Renfro
Robert Silman Associates: Structural Engineering/Historic Preservation
Buro Happold: Structural / MEP Engineering
www.burohappold.com/bh/home.aspx
1,290
views
0
faves
0
comments
Uploaded on July 20, 2010
Taken on July 17, 2010
Map of The High Line Access Points
DESIGN TEAM:
James Corner Field Operations will oversee phase 2 of development (from 20th to 30th streets) which is scheduled to be completed Spring 2011:
Piet Oudolf: Planting Designer
Diller Scofidio + Renfro
Robert Silman Associates: Structural Engineering/Historic Preservation
Buro Happold: Structural / MEP Engineering
www.burohappold.com/bh/home.aspx
1,290
views
0
faves
0
comments
Uploaded on July 20, 2010
Taken on July 17, 2010