This the business end of one of the TBM (Tunnel Boring Machine) in Brisbane drilling a hole under the river, which will allow all those southerners that have moved to Queensland and are clogging up our roads, to move back to their own state more quickly.

This is the 21st Century solution to digging a hole.

 

This is a huge machine that bores and lines the hole with concrete as it moves forward. The excavated material is fed along a huge conveyor that removes it to holding tanks before dropping into trucks for disposal.

 

Some facts

Number of TBMs on the project Two, custom-built

Length 253m

Diameter 12.4m

Weight 4000 tonnes

Electrically powered by 4.2 mega watts

Cost $50 million each

Manufacturer German company Herrenknecht

Made from Steel

Number of rotating cuttters 77

Type of cutters 19-inch tungsten tipped discs

Advance rate 20m p/day

Number of precast segments needed to line the entire tunnel 37,000

Number of people operating each TBM 21 per shift

 

The North-South Bypass Tunnel project is approximately 6.8 kilometres in length from end to end and includes a 4.8 kilometre tunnel as well as associated road connections. The Project also includes a range of urban enhancements to surrounding suburbs. The NSBT is expected to open in the second half of 2010.

 