r. anderson
contentandcontext
meteora
varlaam monastery. before there was a sturdy bridge or safe foot path carved into the cliffs, a winch and pully system was used to raise supplies, and occasionally monks themselves. here it is being used to lift constrution materials.
504
views
0
faves
0
comments
Uploaded on February 7, 2010
Taken on December 7, 2009
meteora
varlaam monastery. before there was a sturdy bridge or safe foot path carved into the cliffs, a winch and pully system was used to raise supplies, and occasionally monks themselves. here it is being used to lift constrution materials.
504
views
0
faves
0
comments
Uploaded on February 7, 2010
Taken on December 7, 2009