The Leeds and Liverpool Canal in Low Bradley, North Yorkshire.
The Leeds and Liverpool Canal was the first of the Trans-Pennine canals to be started and the last to be completed. The length and the complexity of the route meant that the canal took 46 years to build at a cost of five times the original budget.
The canal originates from a proposal in 1765 to construct a canal from Preston to Leeds to carry woollen goods from Leeds and Bradford and limestone from Skipton. Prospective backers in Lancashire argued for the canal to start from Liverpool.
The engineering of the canal is very different from other Trans-Pennine canals. Most of the locks are concentrated in groups with long level sections between. Tunnels and cuttings are avoided where possible with the canal following the contours round bends and loops. In some sections the distance between points by canal is twice the shortest distance. The earliest locks, between Leeds and Bingley, are often grouped together to form staircases of two or three locks. The most spectacular feature of the canal is the five rise lock staircase at Bingley.
The canal prospered through the nineteenth century and was used for carrying stone, coal and many other goods. The impact of the railway age was not as great as with other canals but the coming of the lorry finally saw commercial traffic on the Leeds and Liverpool dwindling. The Bradford Canal closed in 1922 but commercial traffic continued along the main canal until 1964. Regular work stopped in 1972 when the movement of coal to Wigan Power Station ceased.
Information Source:
www.penninewaterways.co.uk/ll/ll2.htm
50773
The Leeds and Liverpool Canal in Low Bradley, North Yorkshire.
The Leeds and Liverpool Canal was the first of the Trans-Pennine canals to be started and the last to be completed. The length and the complexity of the route meant that the canal took 46 years to build at a cost of five times the original budget.
The canal originates from a proposal in 1765 to construct a canal from Preston to Leeds to carry woollen goods from Leeds and Bradford and limestone from Skipton. Prospective backers in Lancashire argued for the canal to start from Liverpool.
The engineering of the canal is very different from other Trans-Pennine canals. Most of the locks are concentrated in groups with long level sections between. Tunnels and cuttings are avoided where possible with the canal following the contours round bends and loops. In some sections the distance between points by canal is twice the shortest distance. The earliest locks, between Leeds and Bingley, are often grouped together to form staircases of two or three locks. The most spectacular feature of the canal is the five rise lock staircase at Bingley.
The canal prospered through the nineteenth century and was used for carrying stone, coal and many other goods. The impact of the railway age was not as great as with other canals but the coming of the lorry finally saw commercial traffic on the Leeds and Liverpool dwindling. The Bradford Canal closed in 1922 but commercial traffic continued along the main canal until 1964. Regular work stopped in 1972 when the movement of coal to Wigan Power Station ceased.
Information Source:
www.penninewaterways.co.uk/ll/ll2.htm