Back to photostream

Getting Started

The first concrete hit the deck at the south east corner of the bridge. The Leveler operator was ready to start leveling it out as soon as they got enough across the end of the bridge to work with.

76 views
0 faves
0 comments
Uploaded on March 17, 2011
Taken on March 16, 2011