Video: Lifting sheet pile in Milwaukee
Video clip: Michels Construction uses a Manitowoc crane to lift a sheet pile. The sheet pile will be driven along the bank of the Milwaukee River with a crane-suspended vibratory hammer ("vibro hammer"). Sitework for the construction of a 31-story highrise in Milwaukee, Wisconsin. The project is located in the Third Ward neighborhood, at 333 North Water. Hines is the developer, the general contractor is W.E. O'Neil, and Michels is doing the foundation work.
September 15, 2022
Original key: IMG_1450
Video: Lifting sheet pile in Milwaukee
Video clip: Michels Construction uses a Manitowoc crane to lift a sheet pile. The sheet pile will be driven along the bank of the Milwaukee River with a crane-suspended vibratory hammer ("vibro hammer"). Sitework for the construction of a 31-story highrise in Milwaukee, Wisconsin. The project is located in the Third Ward neighborhood, at 333 North Water. Hines is the developer, the general contractor is W.E. O'Neil, and Michels is doing the foundation work.
September 15, 2022
Original key: IMG_1450