B&P 3063 Corn Harvest 11-4
The corn harvest is in full swing as the loaded GW-1 heads across the flats at Mt. Morris, NY with 35 salt loads on November 4, 2022. The salt train schedule never flipped in 2022 so that the run to the mine was in daylight. Instead, it has remained on the overnight schedule all year. A track work project on the RSR main to the Springs caused the GW-1 to run in daylight. I figured it was worth catching since it is unknown how long it will run in daylight. It appears it is running in daylight the week of November 7 as well.
B&P 3063 Corn Harvest 11-4
The corn harvest is in full swing as the loaded GW-1 heads across the flats at Mt. Morris, NY with 35 salt loads on November 4, 2022. The salt train schedule never flipped in 2022 so that the run to the mine was in daylight. Instead, it has remained on the overnight schedule all year. A track work project on the RSR main to the Springs caused the GW-1 to run in daylight. I figured it was worth catching since it is unknown how long it will run in daylight. It appears it is running in daylight the week of November 7 as well.