congestion 2
At Moss Vale: The up grain train was held on the down main waiting to access the branch, while the 44-hauled inspection train was held on the branch waiting to enter Moss Vale. Meanwhile, the down passenger had arrived and was held out on the down main.
After the passage of the up passenger from Canberra, the inspection train was admitted to the up platform.
966
views
0
faves
8
comments
Uploaded on April 8, 2010
Taken on March 15, 2010
congestion 2
At Moss Vale: The up grain train was held on the down main waiting to access the branch, while the 44-hauled inspection train was held on the branch waiting to enter Moss Vale. Meanwhile, the down passenger had arrived and was held out on the down main.
After the passage of the up passenger from Canberra, the inspection train was admitted to the up platform.
966
views
0
faves
8
comments
Uploaded on April 8, 2010
Taken on March 15, 2010